{"product_id":"industrial-injection-99-5-02-ae-ford-nav-powerstroke-stock-injector-8-cyl-long-lead-only","title":"Industrial Injection 99.5-02 AE Ford\/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)","description":"\u003cp\u003eIndustrial Injection Model AEPS\u003cbr\u003e\u003cbr\u003eIndustrial Injection 99.5-02 AE Ford\/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only) - Built after 12\/07\/98* Fits E \u0026amp; F Series in this range. \u003c\/p\u003e\n\u003cp\u003eBuilt from all new internal fuel plungers, nozzles, springs and OE internal and external o-rings. Each oil valve is re-manufactured to OE specs and measures at .004\" armature clearance. Industrial Injection DOES NOT SHIP THEIR OIL VALVES LIKE SOME! Each injector is calibrated on their state of the art Hartridge HA230 calibration machine to insure true 4cc cylinder to cylinder fuel delivery. \u003c\/p\u003e","brand":"Powerhouse Diesel","offers":[{"title":"Default Title","offer_id":50555766669372,"sku":"INDAEPS","price":174.55,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0632\/5934\/4956\/files\/246d6deccb98c78f28623e5ce12f75b1L.jpg?v=1790488401","url":"https:\/\/rpm-racing.com\/products\/industrial-injection-99-5-02-ae-ford-nav-powerstroke-stock-injector-8-cyl-long-lead-only","provider":"Racing Precision Motorsports","version":"1.0","type":"link"}