1
/
of
1
Powerhouse Diesel
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Regular price
$174.55 USD
Regular price
$179.95 USD
Sale price
$174.55 USD
Quantity
Couldn't load pickup availability
Industrial Injection Model AEPS
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only) - Built after 12/07/98* Fits E & F Series in this range.
Built from all new internal fuel plungers, nozzles, springs and OE internal and external o-rings. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance. Industrial Injection DOES NOT SHIP THEIR OIL VALVES LIKE SOME! Each injector is calibrated on their state of the art Hartridge HA230 calibration machine to insure true 4cc cylinder to cylinder fuel delivery.
SKU: INDAEPS
Share
